Chubut 2 readout board
After a lot of work I finally have the first version of the Chubut 2 readout board for LGADs ready. More info in this link.
After a lot of work I finally have the first version of the Chubut 2 readout board for LGADs ready. More info in this link.
For a project I will hopefully present and describe in a future post, we need to measure a “large” number of channels with similar characteristics as we currently do with out LeCroy oscilloscopes (see some previous posts). “Large” here means on the order of 8-16 channels, which becomes a bit too much for doing with …
Testing a CAEN digitizer for timing measurements Read More »
So far, for all sensor studies, I have been using either a single channel active board (Santa Cruz or Chubut) or a multi channel passive readout board. Though this works, it is not ideal. Firstly, the passive readout board is not the best because usually the amplifier is installed as close as possible to the …
A week ago I posted about the Robocold setup in this post. Now I have coded further in the control software for it and it is capable of performing automated beta scans on all the detectors. Using this, I have done a beta scan on each of the (working) detectors that are installed at the …
Further preliminary tests with the Robocold setup Read More »
In this post I will present the Robocold beta setup a.k.a. the LGAD long term test setup, LGAD stability test setup, etc. The first presentation of this setup I made it about one year ago in this link. After that, other projects appeared, also the climate chamber was failing, so I ended up delaying the …
In the later months we have engaged in the market survey for the sensors of the CMS MTD. A long time has passed since my previous post focused on the beta setup and I have learned a lot. However, I was still not able to reach the final expected time resolution for the detectors. After …
This is the continuation of my previous post where I showed the main results on the inter-pixel distance measurement in TI-LGADs. In this post I will summarize my results for the same devices but after they have been irradiated. This was presented in the VCI2022 conference, here you can find the slides which I also …
Recently we received our new MCP-PMT of which I presented a first test in this post. Today I am posting the first serious characterization of the device. All the details can be found in this document which I embed below: As a summary, I measured a time resolution of about 22-24 ps for the MCP-PMT …
Characterization of the new MCP-PMT as a timing detector for beta particles Read More »
Recently I have been working on the measurement of the inter-pixel distance of novel Trench Isolated LGAD (TI-LGAD) detectors. I presented my results in the 39th RD50 Workshop in Valencia. In this link you can find my slides, which I also embed here: This post is to provide a (very) brief summary of my work. …
Last week I gave a talk in the parallel sessions about my work in the characterization of the TDCs, both the semi-analog and the fully-digital. In this link there is my presentation in Indico, and below is my presentation, which can also be viewed in “full screen” in this link.